CB
CARROW BENNETT/DataIntelligenceWorkflowsAgent/1 Jan – 31 Dec 2026 Live
Ingested this period
312 source documents → 1,846 structured records
PDF 184CSV 71XLSX 42API 15
SourceTypeRecordStatus
MER-2026-04817.pdfElectricity invoiceRopewalk Yard · 48,210 kWhStructured · evidence attached
gas_hh_march.csvMeter exportRopewalk Yard · 12,480 kWhStructured
Tarrant Steel INV-33921.pdfSupplier invoiceRebar B500B · 84.2 tNeeds review · factor uncertain
freight_march.xlsxLogistics318 movements · 41,900 kmStructured
BOM_Phase2_Rev3.xlsxBill of materials1,204 line itemsMapped 96%
Sage · purchase ledgerERP feed2,311 transactionsClassified
Total emissions · Q1 2026
1,205.18t CO₂e2.6% ↘ vs Q1 2025
Monthly by scope
Anomaly
OctNovDecJanFebMar
Scope 1Scope 2Scope 3
Why did March change?
Gas heating · Ropewalk Yard
18% above degree-day model
+2.1 t ↗
Concrete deliveries · Phase 2
Pour schedule shifted to April
−4.4 t ↘
Grid factor · location-based
Lower carbon intensity in March
−0.3 t ↘
Freight · Tarrant Steel
Two additional deliveries
+0.6 t ↗
Every driver links to its source records
Workflow run · #4,182
Utility invoice validation
Running · 0.8s
Trigger
New invoice received
Meridian · via email
Data
Extract & structure
4 fields · evidence linked
Logic
Compare to meter
Half-hourly total, same period
Action
Flag 6.3% variance
Threshold 2%
Validation
Human review
Assigned to J. Okafor
Output
Ledger updated
Awaiting validation
Invoice
48,210 kWh
Meter
45,352 kWh
Variance
+6.3%
Earthchain AgentCarrow Bennett · Mar 2026
Does the March Meridian bill for Ropewalk Yard match the meter?
Not quite. The invoice shows 48,210 kWh; the half-hourly meter total for the same period is 45,352 kWh — a 6.3% variance. Supply period and MPAN both match, so the most likely cause is an estimated read.
MER-2026-04817.pdfropewalk_hh_march.csvConfidence 0.91
I can email Meridian to request an actual read and attach their reply to this record. Shall I?
Approve and sendEdit draftNot now
Does the March Meridian bill for Ropewalk Yard match the meter?Ask about your data…
Suggested
Check March invoices against meter data
Which sites drove the Q1 increase?
Draft a data request for Tarrant Steel
Also works without being asked
On a schedule
Mondays 08:00 · variance check across 14 sites
On an event
New invoice ingested → validated against meter
Over email
Reads supplier replies, attaches them as evidence
Never sends or changes anything without your approval